Business Unit >
BSSR
PT. Baramulti Suksessarana, Tbk.
●
|
Located in East Kalimantan, Indonesia, 25km south west concession area of Samarinda, the capital city of the province.
|
●
|
IUP for 8 years starting 2010 with option of 2 x 10 years' extension and royalty of 3-7% of sales.
|
●
|
Total area: 2,459.8 Ha.
|
●
|
Commercial operation commenced in June 2011 with planned production capacity of 1.5mn tons by end-2014.
|
●
|
BSSR is divided into 4 blocks and the coal is marketed according to the block from which it is mined.
|
●
|
BSSR is currently mining in the Eastern Area (Bara 8).
|
- The western part of BSSR has higher calorie coal and lower moisture compared to the eastern part
- As part of the expansion of production capacity to 1.5mn tons, the plan is to build an underpass to access the western
- part of BSSR
Coal Specifications
Specifications | Bara 1 | Bara 2 | Bara 4 | Bara 8 |
Total Moisture (% gar) | 32.6 | 35.4 | 37.3 | 46 |
Inherent Moisture (% adb) | 19.1 | 15.8 | 15.6 | 17 |
Ash (% adb) | 3.6 | 3.7 | 4.9 | 5.7 |
Volatile Matter (% adb) | 39.8 | 41.7 | 41.1 | 37.8 |
Fixed Carbon (% adb) | 37.5 | 38.8 | 38.4 | 36.6 |
Total Sulphur (% adb) | 0.22 | 0.34 | 0.35 | 0.51 |
Calorific Value (kcal/kg adb) | 5220 | 5300 | 5120 | 5100 |
Calorific Value (kcal/kg gar) | 4350 | 4065 | 3800 | 3300 |
Source: ASEAMCO
Logistics
Infrastructure