Business Unit >

BSSR

PT. Baramulti Suksessarana, Tbk.

Located in East Kalimantan, Indonesia, 25km south west concession area of Samarinda, the capital city of the province.

IUP for 8 years starting 2010 with option of 2 x 10 years' extension and royalty of 3-7% of sales.

Total area: 2,459.8 Ha.

Commercial operation commenced in June 2011 with planned production capacity of 1.5mn tons by end-2014.

BSSR is divided into 4 blocks and the coal is marketed according to the block from which it is mined.

BSSR is currently mining in the Eastern Area (Bara 8).
  • The western part of BSSR has higher calorie coal and lower moisture compared to the eastern part
  • As part of the expansion of production capacity to 1.5mn tons, the plan is to build an underpass to access the western
  • part of BSSR
 
 
Coal Specifications
 
Specifications Bara 1 Bara 2 Bara 4 Bara 8
Total Moisture (% gar) 32.6 35.4 37.3 46
Inherent Moisture (% adb) 19.1 15.8 15.6 17
Ash (% adb) 3.6 3.7 4.9 5.7
Volatile Matter (% adb) 39.8 41.7 41.1 37.8
Fixed Carbon (% adb) 37.5 38.8 38.4 36.6
Total Sulphur (% adb) 0.22 0.34 0.35 0.51
Calorific Value (kcal/kg adb) 5220 5300 5120 5100
Calorific Value (kcal/kg gar) 4350 4065 3800 3300
Source: ASEAMCO
 
 
Logistics
 
 
Infrastructure